Skip to main content

Survey: Your Opinion About the Metro Line Extension

In late 2020, the Los Angeles County Metropolitan Transportation Authority (LACMTA) began planning for the Gold Line extension, which would connect East Los Angeles to Union Station before heading northward into the San Gabriel Valley. 

The attachments below outline the latest draft of the current draft plan. Before moving forward, LACMTA seeks feedback on two key topics:

  1. Neighborhood and city-wide priorities, opportunities, and considerations regarding a Gold Line extension
  2. Criteria to help assess a potential route and station location options at each planned site

The timeline below shows where we are in our process and provides more information about how your input will be used.

You're viewing real-time data. Participant counts are continuously updated for administrators. Please note that regular users see cached data, which may result in slight differences in the numbers.
1 participant

16 weeks left

Phases

Phases overview
Phase 1: Initial Planning and Brainstorming
Initial Planning and Brainstorming
Phase 3: Data Collection and Analysis
Data Collection and Analysis

Community Survey

August 1, 2024 - September 1, 2026

Take the survey below to let us know what you think about the upcoming GoldLine extension. We want to hear from you!

Take the survey

To know if you can take part in this survey, please to the platform first.

Upcoming and ongoing events

    0 events have loaded.
    No upcoming or ongoing events are currently scheduled.

    Past events

    • Two children playing

      Subway event

      Event date: February 1st, 2026 from 12:00 PM to 12:30 PM.

      Registrants

      1 registrant

    1 event has loaded.